Previously outfitted as a textile factory, this 142,000 sf tenant fit-out project features 5 overhead dock doors, and an interior van loading area complete with 230 ft of interior trench drains over 170 cubic yards of concrete. The scope included major demolition, extensive site work, utility upgrades, new fire suppression, fire alarm, and HVAC systems, …
This 300,000 sf tenant fit-out project features 48 overhead dock doors, 9 active trailer positions, interior van loading area, an interior parking lot, and four drive-in ramps. The scope included major site work, utility upgrades, new fire suppression, fire alarm, and HVAC systems, new motion-activated LED lighting throughout the warehouse, and 10,000 sf of new …
This 153,000 sf tenant fit-out project features 11 active trailer positions, interior van loading area, and drive-in ramp. The scope included major site work, utility upgrades, new fire suppression, fire alarm, and HVAC systems, new motion-activated LED lighting throughout the warehouse, remote EV charging parking lot, 24ft high sound wall, and 9,000 sf of new …
This 350,000 sf tenant fit-out project features 38 overhead dock doors, 7 active trailer positions, 36,800 sf exterior van loading canopy, and two interior parking lots complete with trench drains. The scope included major site work, utility upgrades, new fire suppression, fire alarm, and HVAC systems, new motion-activated LED lighting throughout the warehouse, warehouse employee …
This 181,000 sf tenant fit-out project features 6 active trailer positions, interior van loading area, interior parking lot, and drive-in ramp. The scope included utility upgrades, new fire suppression, fire alarm, and HVAC systems, new motion-activated LED lighting throughout the warehouse, and 12,000 sf of new office space for team break rooms and training facilities. …
This 662,000 sf tenant fit-out project features 83 overhead dock doors, 16 active trailer positions, two interior van loading areas, and two interior parking lots. The scope included major site work, utility upgrades, new fire suppression, fire alarm, and HVAC systems, new motion-activated LED lighting throughout the warehouse, and 10,000 sf of new office space …
Donnelly Construction was selected to build a new pre-school Early Learning Center in the Clinton Hill section of Newark. We worked closely with the owner and architect throughout Pre-Construction – from the initial conceptual phase to Schematic Design, Design Development, and the completion of Construction Drawings – providing budgeting services, best practice recommendations, value engineering …
WAYNE, NJ – Donnelly Construction and Studio 1200 partnered with PIM Brands, Inc. on the renovation and build-out of their new Park Ridge headquarters, which recently held its grand opening. This milestone marked a triumphant end to a very challenging project, a culmination of over a year’s worth of hard work and perseverance in the face of a pandemic.