A “Topping Out Ceremony”

Ramsey Golf & Country Club

When Ramsey Golf & Country Club decided it was time to replace their pool building and renovate their forty year-old pool, they chose Donnelly Construction. The existing one-story building with minimal facilities and exterior pool equipment was replaced with a two-story building complete with locker rooms, kitchen, bar, deck, and pool equipment room. The result …

The Apawamis Club

The Apawamis Club selected Donnelly Construction as their Construction Manager for both their Upper Campus and Lower Campus projects. The Upper Campus project included the addition of a new covered patio and 2nd floor deck for outside dining, an addition and renovation to the Club Dining Room (including a new bar and wine room), and …

The Donnelly Team celebrates the opening of Building 1 at Mound Road Industrial Park in Warren, MI!

The Donnelly Team attends the official ribbon cutting ceremony celebrating the opening of Building 1 at Mound Road Industrial Park in Warren, MI! Congratulations to NorthPoint Development and the Donnelly Construction Team on a fantastic build. Mound Road Industrial Park is a 1.4 million square foot industrial park, consisting of four Class-A buildings across 130 …

25,000 sf Industrial Building

Donnelly Construction has broken ground on a 25,000-square-foot industrial building at 441 Newark-Pompton Turnpike in Wayne. The facility will have 25-foot ceiling heights and a layout that includes 1,800 square feet of office and 2,080 square feet of mezzanine space.

Spring Lake Golf Club

This is Donnelly’s second major renovation and addition at Spring Lake. This phase included a complete design overhaul of the existing Clubhouse , a new addition to create a Members Entrance Hall , and an addition to the Club’s 1898 Pubroom , for increased bar seating and member dining counts, two new restrooms, an amazing …

Dayton Distribution Center

Donnelly Construction is hard at work on a 142,000 sf tilt-up industrial warehouse featuring 14 active trailer positions, a 58,000 sf exterior van loading canopy and 12,000 sf of office space. The site is prepped for 600 EV chargers. Project is due for completion Summer 2022.