A “Topping Out Ceremony”
Was held as the last steel beam of the new Most Blessed Sacrament church was signed by students before it was installed at the building’s highest point.
Was held as the last steel beam of the new Most Blessed Sacrament church was signed by students before it was installed at the building’s highest point.
When Ramsey Golf & Country Club decided it was time to replace their pool building and renovate their forty year-old pool, they chose Donnelly Construction. The existing one-story building with minimal facilities and exterior pool equipment was replaced with a two-story building complete with locker rooms, kitchen, bar, deck, and pool equipment room. The result …
The Apawamis Club selected Donnelly Construction as their Construction Manager for both their Upper Campus and Lower Campus projects. The Upper Campus project included the addition of a new covered patio and 2nd floor deck for outside dining, an addition and renovation to the Club Dining Room (including a new bar and wine room), and …
The Donnelly Team attends the official ribbon cutting ceremony celebrating the opening of Building 1 at Mound Road Industrial Park in Warren, MI! Congratulations to NorthPoint Development and the Donnelly Construction Team on a fantastic build. Mound Road Industrial Park is a 1.4 million square foot industrial park, consisting of four Class-A buildings across 130 …
Receives $10M Gift To Build New Gym And Wellness Center. The Ho-Ho-Kus Board of Education announced yesterday the receipt of a $10 million gift from Dave and Cheryl Duffield for the construction of Duffield Hall, a new gymnasium and wellness center, at the Ho-Ho-Kus Public School. The project was designed by LAN Associates and will …
Donnelly Construction has broken ground on a 25,000-square-foot industrial building at 441 Newark-Pompton Turnpike in Wayne. The facility will have 25-foot ceiling heights and a layout that includes 1,800 square feet of office and 2,080 square feet of mezzanine space.
This is Donnelly’s second major renovation and addition at Spring Lake. This phase included a complete design overhaul of the existing Clubhouse , a new addition to create a Members Entrance Hall , and an addition to the Club’s 1898 Pubroom , for increased bar seating and member dining counts, two new restrooms, an amazing …
on their new church. Members of the 2,000 family congregation gathered to celebrate the start of construction.
to the Clinton Hill Early Learning Center, on being named a 2022 New Jersey Business Magazine, New
Good Neighbor Award Winner!
Donnelly Construction is hard at work on a 142,000 sf tilt-up industrial warehouse featuring 14 active trailer positions, a 58,000 sf exterior van loading canopy and 12,000 sf of office space. The site is prepped for 600 EV chargers. Project is due for completion Summer 2022.