Donnelly Construction has broken ground on a 25,000-square-foot industrial building at 441 Newark-Pompton Turnpike in Wayne. The facility will have 25-foot ceiling heights and a layout that includes 1,800 square feet of office and 2,080 square feet of mezzanine space.
This is Donnelly’s second major renovation and addition at Spring Lake. This phase included a complete design overhaul of the existing Clubhouse , a new addition to create a Members Entrance Hall , and an addition to the Club’s 1898 Pubroom , for increased bar seating and member dining counts, two new restrooms, an amazing …
Continue reading “Spring Lake Golf Club”
on their new church. Members of the 2,000 family congregation gathered to celebrate the start of construction.
to the Clinton Hill Early Learning Center, on being named a 2022 New Jersey Business Magazine, New
Good Neighbor Award Winner!
Donnelly Construction is hard at work on a 142,000 sf tilt-up industrial warehouse featuring 14 active trailer positions, a 58,000 sf exterior van loading canopy and 12,000 sf of office space. The site is prepped for 600 EV chargers. Project is due for completion Summer 2022.
Previously outfitted as a textile factory, this 142,000 sf tenant fit-out project features 5 overhead dock doors, and an interior van loading area complete with 230 ft of interior trench drains over 170 cubic yards of concrete. The scope included major demolition, extensive site work, utility upgrades, new fire suppression, fire alarm, and HVAC systems, …
Continue reading “Haverhill Distribution Center”
This 300,000 sf tenant fit-out project features 48 overhead dock doors, 9 active trailer positions, interior van loading area, an interior parking lot, and four drive-in ramps. The scope included major site work, utility upgrades, new fire suppression, fire alarm, and HVAC systems, new motion-activated LED lighting throughout the warehouse, and 10,000 sf of new …
Continue reading “Bellingham Distribution Center”
This 153,000 sf tenant fit-out project features 11 active trailer positions, interior van loading area, and drive-in ramp. The scope included major site work, utility upgrades, new fire suppression, fire alarm, and HVAC systems, new motion-activated LED lighting throughout the warehouse, remote EV charging parking lot, 24ft high sound wall, and 9,000 sf of new …
Continue reading “Windsor Distribution Center”
This 350,000 sf tenant fit-out project features 38 overhead dock doors, 7 active trailer positions, 36,800 sf exterior van loading canopy, and two interior parking lots complete with trench drains. The scope included major site work, utility upgrades, new fire suppression, fire alarm, and HVAC systems, new motion-activated LED lighting throughout the warehouse, warehouse employee …
Continue reading “Taunton Distribution Center”